{"id":862,"date":"2025-08-22T08:07:53","date_gmt":"2025-08-22T08:07:53","guid":{"rendered":"https:\/\/ev.com.au\/blog\/?p=862"},"modified":"2025-08-22T08:07:53","modified_gmt":"2025-08-22T08:07:53","slug":"the-push-for-more-charging-stations-at-highway-rest-stops","status":"publish","type":"post","link":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/","title":{"rendered":"The Push for More Charging Stations at Highway Rest Stops"},"content":{"rendered":"\n<p>Highway rest stops are the backbone of safe, <a href=\"https:\/\/ev.com.au\/blog\/uncategorized\/how-to-plan-long-distance-trips-with-an-ev-in-australia\/\"><strong>long-distance road travel<\/strong><\/a>. As electric vehicles become common, rest stops play a new role: reliable <a href=\"https:\/\/ev.com.au\/blog\/uncategorized\/fast-charging-networks-mapping-australias-rapid-chargers\/\"><strong>fast-charging hubs<\/strong><\/a> that allow drivers to refresh while their car gets the range it needs. Expanding chargers at rest stops is a logical priority, but delivering it requires planning, funding and coordination between governments, power networks and private operators. This article explores why rest-stop charging matters, practical design principles, challenges and how to scale chargers along Australia\u2019s major highways.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Table of Contents<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=1.%20WHY%20REST%2DSTOP%20CHARGING%20IS%20CRITICAL%20FOR%20EV%20ADOPTION\">Why rest-stop charging is critical for EV adoption<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=2.%20DESIGN%20PRINCIPLES%20FOR%20EFFECTIVE%20REST%2DSTOP%20CHARGERS\">Design principles for effective rest-stop chargers<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=3.%20FUNDING%20AND%20DELIVERY%20MODELS%20THAT%20WORK%20FOR%20CORRIDORS\">Funding and delivery models that work for corridors<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=4.%20TECHNICAL%20CONSTRAINTS%20AND%20SOLUTIONS%20(POWER%2C%20RELIABILITY)\">Technical constraints and solutions (power, reliability)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=5.%20OPERATIONAL%20CONSIDERATIONS%20(MAINTENANCE%2C%20AMENITIES%2C%20SAFETY)\">Operational considerations (maintenance, amenities, safety)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=6.%20SCALING%20THE%20NETWORK%3A%20CORRIDOR%20PRIORITIES%20AND%20ROLLOUT%20SEQUENCING\">Scaling the network: corridor priorities and rollout sequencing<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=into%20the%20network.-,FAQS,-Q%3A%20How%20far\">FAQs<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ev.com.au\/blog\/?p=862&amp;preview=true&amp;_thumbnail_id=605#:~:text=the%20practical%20solution.-,CONCLUSION,-Highway%20rest%2Dstop\">Conclusion<\/a><\/li>\n<\/ol>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">1. Why rest-stop charging is critical for EV adoption<\/h2>\n\n\n\n<p>Rest stops are natural places to charge because travellers already plan breaks every few hours. Good rest-stop chargers reduce range anxiety, support regional tourism and make long-distance EV driving practical. Without a reliable corridor of well-maintained fast chargers, many drivers will hesitate to switch to electric for cross-state travel.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">2. Design principles for effective rest-stop chargers<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">a) Charger type matched to stop duration<\/h3>\n\n\n\n<p>Highway stops need fast chargers (150\u2013350 kW) to add meaningful range during short breaks. For short coffee or restroom stops, higher-power DC chargers are essential; longer service stops can combine DC and AC.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">b) Multiple bays and redundancy<\/h3>\n\n\n\n<p>Build more than one fast-charging bay per rest stop and ensure redundancy so a broken unit doesn\u2019t strand multiple cars. Redundancy reduces queuing and keeps reliability high.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">c) Clear approach lanes and safe siting<\/h3>\n\n\n\n<p>Charger bays should be easy to access, with safe entry\/exit, good lighting and protection from heavy-vehicle traffic. Separate parking for EVs avoids conflicts.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">d) Integrated amenities and dwell-time services<\/h3>\n\n\n\n<p>Coffee, toilets, picnic areas, and local information make waiting pleasant and increase local economic benefits.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">e) Payment simplicity and roaming<\/h3>\n\n\n\n<p>Tap-to-charge, unified billing and roaming between networks reduce user friction.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">3. Funding and delivery models that work for corridors<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">a) Public-private partnerships (PPP)<\/h3>\n\n\n\n<p>PPP models combine public corridor planning and private deployment expertise. Governments often underwrite early investment in low-traffic segments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">b) Grants and co-funding for rural gaps<\/h3>\n\n\n\n<p>State and federal grants help build chargers in low-return areas, ensuring geographic equity.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">c) Retailer-hosted models<\/h3>\n\n\n\n<p>Fuel and retail chains upgrade sites for EV customers, combining fuel, food and fast charging in one stop.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">d) Utility-led builds with commercial operators<\/h3>\n\n\n\n<p>Utilities can invest in grid upgrades and host chargers, contracting commercial operators for day-to-day operations.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">4. Technical constraints and solutions (power, reliability)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">a) Grid capacity &amp; costly upgrades<\/h3>\n\n\n\n<p>High-power chargers often require significant upstream capacity. Solutions include battery buffers to smooth demand, on-site solar for daytime offset, and negotiating staged grid upgrades with distributors.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">b) Energy management &amp; V2G potential<\/h3>\n\n\n\n<p>Smart load management and vehicle-to-grid testing help mitigate peak demand and improve economics.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">c) Resilience and backup power<\/h3>\n\n\n\n<p>Remote rest stops benefit from battery backup or hybrid solutions to ensure consistent service during outages.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">5. Operational considerations (maintenance, amenities, safety)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Regular maintenance contracts and SLAs<\/strong> keep chargers functional.<\/li>\n\n\n\n<li><strong>24\/7 monitoring and local technician rosters<\/strong> reduce downtime.<\/li>\n\n\n\n<li><strong>Security (lighting, cameras)<\/strong> adds traveller safety.<\/li>\n\n\n\n<li><strong>Accessible bays and clear signage<\/strong> ensure inclusivity for all drivers.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">6. Scaling the network: corridor priorities and rollout sequencing<\/h2>\n\n\n\n<p>Start by mapping high-volume routes and tourist corridors, then prioritize:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Interstate highways and major freight routes<\/li>\n\n\n\n<li>Tourism-heavy routes (coastal and outback corridors)<\/li>\n\n\n\n<li>Rural connectors with long distances between towns<\/li>\n<\/ol>\n\n\n\n<p>A pragmatic rollout pairs high-capacity hubs every 100\u2013150 km with smaller regional chargers feeding into the network.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">FAQs<\/h2>\n\n\n\n<p><strong>Q: How far apart should fast chargers be on major highways?<\/strong><br>A: Aim for stations roughly every 100\u2013150 km on primary corridors so most EVs can travel comfortably without lengthy detours.<\/p>\n\n\n\n<p><strong>Q: Do rest-stop chargers need commercial operators?<\/strong><br>A: Yes \u2014 operational expertise for maintenance, payments and uptime improves reliability over ad-hoc installs.<\/p>\n\n\n\n<p><strong>Q: Can solar power these stations?<\/strong><br>A: Solar helps offset energy but rarely alone powers high-speed charging; pairing with batteries and grid connections is the practical solution.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Conclusion<\/h3>\n\n\n\n<p>Highway rest-stop charging is a critical piece of Australia\u2019s EV transition. Designing effective stops means placing high-power, redundant chargers at safe, amenity-rich locations and solving technical constraints like grid upgrades through batteries, smart management and hybrid funding models. With coordinated planning and public-private partnerships, rest stops can shift from mere refuelling points to reliable EV hubs that support long-distance travel, tourism and freight \u2014 turning range anxiety into confident planning.<\/p>\n\n\n\n<p><strong>Meta Description:<\/strong> Learn why more fast chargers at highway rest stops are essential for Australia\u2019s EV future \u2014 design principles, funding models, technical solutions and rollout priorities for reliable corridor charging.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highway rest stops are the backbone of safe, long-distance road travel. As electric vehicles become common, rest stops play a new role: reliable fast-charging hubs that allow drivers to refresh while their car gets the range it needs. Expanding chargers at rest stops is a logical priority, but delivering it requires planning, funding and coordination between governments, power networks and private operators. This article explores why rest-stop charging matters, practical design principles, challenges and how to scale chargers along Australia\u2019s [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":605,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-862","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The Push for More Charging Stations at Highway Rest Stops | EV<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Push for More Charging Stations at Highway Rest Stops | EV\" \/>\n<meta property=\"og:description\" content=\"Highway rest stops are the backbone of safe, long-distance road travel. As electric vehicles become common, rest stops play a new role: reliable fast-charging hubs that allow drivers to refresh while their car gets the range it needs. Expanding chargers at rest stops is a logical priority, but delivering it requires planning, funding and coordination between governments, power networks and private operators. This article explores why rest-stop charging matters, practical design principles, challenges and how to scale chargers along Australia\u2019s [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/\" \/>\n<meta property=\"og:site_name\" content=\"EV\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-22T08:07:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1960\" \/>\n\t<meta property=\"og:image:height\" content=\"1103\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Blog Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Blog Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/\",\"url\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/\",\"name\":\"The Push for More Charging Stations at Highway Rest Stops | EV\",\"isPartOf\":{\"@id\":\"https:\/\/ev.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png\",\"datePublished\":\"2025-08-22T08:07:53+00:00\",\"author\":{\"@id\":\"https:\/\/ev.com.au\/blog\/#\/schema\/person\/c965373eea9b95ead2ccd1006311ec22\"},\"breadcrumb\":{\"@id\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#primaryimage\",\"url\":\"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png\",\"contentUrl\":\"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png\",\"width\":1960,\"height\":1103},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ev.com.au\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Push for More Charging Stations at Highway Rest Stops\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ev.com.au\/blog\/#website\",\"url\":\"https:\/\/ev.com.au\/blog\/\",\"name\":\"EV\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ev.com.au\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/ev.com.au\/blog\/#\/schema\/person\/c965373eea9b95ead2ccd1006311ec22\",\"name\":\"Blog Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/ev.com.au\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/03b7c33a58e2b75bdc6a88ca3d13bd5c739e2a7e9120dab1f0e9ed3ca6aaf38b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/03b7c33a58e2b75bdc6a88ca3d13bd5c739e2a7e9120dab1f0e9ed3ca6aaf38b?s=96&d=mm&r=g\",\"caption\":\"Blog Admin\"},\"sameAs\":[\"http:\/\/ev.com.au\"],\"url\":\"https:\/\/ev.com.au\/blog\/author\/blog-admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Push for More Charging Stations at Highway Rest Stops | EV","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/","og_locale":"en_US","og_type":"article","og_title":"The Push for More Charging Stations at Highway Rest Stops | EV","og_description":"Highway rest stops are the backbone of safe, long-distance road travel. As electric vehicles become common, rest stops play a new role: reliable fast-charging hubs that allow drivers to refresh while their car gets the range it needs. Expanding chargers at rest stops is a logical priority, but delivering it requires planning, funding and coordination between governments, power networks and private operators. This article explores why rest-stop charging matters, practical design principles, challenges and how to scale chargers along Australia\u2019s [&hellip;]","og_url":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/","og_site_name":"EV","article_published_time":"2025-08-22T08:07:53+00:00","og_image":[{"width":1960,"height":1103,"url":"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png","type":"image\/png"}],"author":"Blog Admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Blog Admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/","url":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/","name":"The Push for More Charging Stations at Highway Rest Stops | EV","isPartOf":{"@id":"https:\/\/ev.com.au\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#primaryimage"},"image":{"@id":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#primaryimage"},"thumbnailUrl":"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png","datePublished":"2025-08-22T08:07:53+00:00","author":{"@id":"https:\/\/ev.com.au\/blog\/#\/schema\/person\/c965373eea9b95ead2ccd1006311ec22"},"breadcrumb":{"@id":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/"]}]},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#primaryimage","url":"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png","contentUrl":"https:\/\/ev.com.au\/blog\/wp-content\/uploads\/2025\/07\/1-4.png","width":1960,"height":1103},{"@type":"BreadcrumbList","@id":"https:\/\/ev.com.au\/blog\/uncategorized\/the-push-for-more-charging-stations-at-highway-rest-stops\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ev.com.au\/blog\/"},{"@type":"ListItem","position":2,"name":"The Push for More Charging Stations at Highway Rest Stops"}]},{"@type":"WebSite","@id":"https:\/\/ev.com.au\/blog\/#website","url":"https:\/\/ev.com.au\/blog\/","name":"EV","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ev.com.au\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":"Person","@id":"https:\/\/ev.com.au\/blog\/#\/schema\/person\/c965373eea9b95ead2ccd1006311ec22","name":"Blog Admin","image":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/ev.com.au\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/03b7c33a58e2b75bdc6a88ca3d13bd5c739e2a7e9120dab1f0e9ed3ca6aaf38b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/03b7c33a58e2b75bdc6a88ca3d13bd5c739e2a7e9120dab1f0e9ed3ca6aaf38b?s=96&d=mm&r=g","caption":"Blog Admin"},"sameAs":["http:\/\/ev.com.au"],"url":"https:\/\/ev.com.au\/blog\/author\/blog-admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/posts\/862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/comments?post=862"}],"version-history":[{"count":3,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/posts\/862\/revisions"}],"predecessor-version":[{"id":872,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/posts\/862\/revisions\/872"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/media\/605"}],"wp:attachment":[{"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/media?parent=862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/categories?post=862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ev.com.au\/blog\/wp-json\/wp\/v2\/tags?post=862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}